Professional Practices 3
Here are all of my current RA Project Deliverables with outlined text, in the correct document formats (hopefully) with bleeds and borders and the vectors imported correctly and all the other stuff which is needed for each one.
I have done roughly a third of the Final deliverables over the past two weeks and that was only from a few hours here and there, so I think completing this project to an extent that I am happy with before the deadline will be possible over christmas, depending on what more I complete within the next two weeks.
I think my inital struggle and apprehension of this project was my unfamiliarity with the intricacies of Illlustrator down so the issues I had with the Font, Editing Vectors in the documents, outlining text etc. and also not having a final design down which i was confident in such as with the size of elements and particularly the colour of text and graphics too. Initially, it was all Black text but after some advice I changed it to mainly Yellow with an accompanying White for smaller text.
Comments
Post a Comment